Water Supply & Sewage System
September 1, 2024Earth Retaining
September 2, 2024Sr. No. | Client | Contractor | Projects | Year | Cost | Sector | Sub_Sect | Status |
Rock Fall Protection and Rock Fall Arresting System | ||||||||
1 | M/s City & Industrial Development Corporation of Maharashtra Ltd. | N. A. | Proposed rock fall Mitigation / Protection system at Pushpak Nagar – Design Consultancy Service | Sep-19 | 3 Lacs | Rock Fall Protection | Completed | |
2 | M/s CIDCO | N. A. | Proposed rock fall Mitigation / Protection system at Karanjade – Design Consultancy Service | Aug-20 | 3 Lacs | Rock Fall Protection | Completed | |
3 | M/s East Central Railway | M/s Garware Technical Fibers, Pune | Design of Rock fall protection, slope stabilization and other ancillary work in cutting area in connection with construction of New B.G. Rail Line between Koderma – Tilaiya of Jharkhand portion. | Jul-19 | Rock Fall Protection | Completed | ||
4 | Deputy Chief Engineer/Con East Central Railway Barkakana, Ranchi | M/S Garware Technical Fibers, Pune | Rockfall Protection Works Between Chainage Km 151.600 To 151.750 On LHS and RHS 156.643 To 156.743 on LHS in New B.G Line of Barkakana-Ranchi Section | 1.0 Lacs | Rock Fall Protection | Completed | ||
5 | M/s JCC Infraprojects Pvt. Ltd. | M/S Garware Technical Fibers, Pune | Rockfall Protection Works in Connection with Bangurgram – Guriya BG Doubling Project of North Western Railways | Rock Fall Protection | Completed | |||
6 | South Western Railway | M/S Garware Technical Fibers, Pune | Stabilization of Slopes and Rock Falling Locations Near Bridge and Tunnel in Castlerock (Clr)-Kulem (Qlm) | Rock Fall Protection | Completed | |||
7 | M/s MSRDC | M/s Pioneer Foundation Engineers Pvt. Ltd., Thane | Mitigation Measures of Rockfall / Slide Near Adoshi Tunnel on Mumbai-Pune Expressway, Ch 41/575 to Ch 41/615 | Aug. 20 | Rock Fall Protection | Completed | ||
8 | M/s MMRDA | M/s Pioneer Foundation Engineers Pvt. Ltd., Thane | Stabilisation and Mitigation of Landslide Area Between Km 510/005 to 510/095 Below TOI Building on Western Express Highway, Bandongari Hill Kandivali, Mumbai. | May-21 | Rock Fall Protection | Completed | ||
9 | M/s PWD, Mumbai | M/s Pioneer Foundation Engineers Pvt. Ltd., Thane | Rock Fall Protection of Gilbert Hill, Andheri (W), Mumbai | Jan-20 | Rock Fall Protection | Completed | ||
10 | Suncity developers Powai | Geotechnical Consultancy services for designing the system for protection of Cliff and related works located adjacent to the building No 4 on plot bearing CTS No 4D / 1 and 4D/3 of village Hariyali,Powai,Mumbai | Jan-20 | Rock Fall Protection | Completed | |||
11 | Garware Technical Fibres | Construction of RS Wall for Slope Stabilization work Angul – Sukinda New BG Rail Line Project, Odisha State, India | Oct-23 | Rock Fall Protection | Completed | |||
12 | Garware Technical Fibres | Design of Superimposed Reinforced Soil Walls as Solution For Collapsed Slopes Near ETP Location For M/s Godrej – Sikkim | Oct-23 | Rock Fall Protection | Completed | |||
13 | M/s Godrej, Sikkim | M/S Garware Technical Fibres Ltd. | Proposal for the Restabilization of 35 m high R S Wall Near ETP Location | Sept-23 | Rock Fall Protection | Completed | ||
14 | National Highways & Infrastructure Corporation Ltd. | Garware Technical Fibres Ltd. | Design and analysis of Avalanche protection barrier between design chainage km 42+200 to km 42+700 – “Widening & Up-Gradation to 2 lane with Paved shoulder of NH-301 Kargil-Zanskar Road from Design km 30.040 (Ex. km 30.000) to Design km 57.000 (Ex. km 57.905) of 26.960 Km length in the Union Territory of Ladakh on EPC mode (Pkg –II) | May-22 | ||||
15 | Rail Vikas Nigam Limited | Garware Technical Fibres Ltd. | Slope Stabilization with Stepped RS Wall for Angul – Sukinda New BG Rail Line Project, Odisha State, India | 23-Feb | ||||
3 | Rail Vikas Noigam Ltd. | M/s Garware Technical Fibres Ltd., Pune | Slope Protection Works in Cutting Section Near Bridge No.179 Between Angul & Sukinda – New BG Railway Line In The State of Odisha, India | |||||
11 | National Highways & Infrastructure Corporation Ltd. | Garware Technical Fibres Ltd. | Design and analysis of Avalanche protection barrier between design chainage km 42+200 to km 42+700 – “Widening & Up-Gradation to 2 lane with Paved shoulder of NH-301 Kargil-Zanskar Road from Design km 30.040 (Ex. km 30.000) to Design km 57.000 (Ex. km 57.905) of 26.960 Km length in the Union Territory of Ladakh on EPC mode (Pkg –II) | May-22 | Rock Fall Protection | Completed | ||
12 | M/S. SUNCITY HOUSING | M/s Pioneer Foundation Engineers Pvt. Ltd., Thane | Rock Slope Protection Works – SUNCITY Cliff Stability besides the proposed building no. 4 on plot bearing CTS No. 4D/1 & 4D/3 of village Hariyali, Powai – Mumbai |
Jan-23 | Rock Fall Protection | Completed | ||
14 | M/s. R & B Department, Ahmedabad Division, Gujrat | M/s Shivam Concrete Technology & Consultancy Pvt. Ltd. | Rectification of RS Wall using Soil Nails at project site M/s. R & B Department, Ahmedabad Division, Gujrat | Nov-23 | RS Wall Stabilization | Completed | ||
15 | M/s. National Highway Authority of India | M/s Shivam Concrete Technology & Consultancy Pvt. Ltd. | Rectification of RS Wall using Soil Nails for 4/6 Laning of Ghaziabad-Aligarh from Km 119+900 to Km 130+300 | Feb-24 | RS Wall Stabilization | Completed | ||
16 | M/s. National Highway Authority of India | M/s Shivam Concrete Technology & Consultancy Pvt. Ltd. | Rectification of RS Wall using Soil Nails for 4/6 Laning of Ghaziabad-Aligarh _KM 36+409 | Apr-24 | RS Wall Stabilization | Completed | ||
17 | M/s. National Highway Authority of India | M/s Shivam Concrete Technology & Consultancy Pvt. Ltd. | Rectification of RS Wall using Soil Nails for 4/6 Laning of Ghaziabad-Aligarh _KM 41 | Mar-24 | RS Wall Stabilization | Completed | ||
19 | M/s. National Highway Authority of India | M/s Tata | Review of Design of R E walls, foundation system and drainage arangements for the project of Four laning of Hospet-Chitradurga section of NH – 50 (Old NH 13) from km 299.00 to 418.750 km in the state of Karnataka | Mar-24 | RS Wall Stabilization | Completed |
Slope Stabilization | ||||||||
1 | M/s Sekura Roads Limited | M/s Sekura Roads Limited | Design of Slope Stabilization for 1.63 km stretch – Jorabat-Shillong Expressway Limited (JSEL), NH-40 | 21-May | Slope Stability | Completed | Completed | |
2 | M/s. Adani Road Transport Ltd. | M/s Shivam Concrete Technology & Consultancy Pvt. Ltd. | Soil Nailing works at project site for Six Laning of Azhiyur to Vengalam in the State of Kerala. | Jul-23 | Slope Stabilization | Completed |