Sr. No. Client Contractor Projects Year Cost Sector Sub_Sect Status
Ground Improvement
1 M/s IOCL M/s Fabtech Projects & Engineers Ltd. Design of Bored Cast in-situ Piles for N/S Piperack under Seismic Condition – Bongaigaon Refinery Dhaligaon, Chirang, Assam  –   STONE COLUMNS Jul-17 15 Lacs Stone Column Completed
2 M/s IOCL M/s Adarsh Noble Corporation Ltd. Proposed Foundation Scheme for 52.3 Dia. HSD Tank at Paradip Refinery  –   STONE COLUMNS Feb-17 7 Lacs Stone Column Completed
3 M/s Oil India Ltd. M/s Fabtech Projects & Engineers Ltd. Design of Guard Pond Walls using concept of Reinforced Earth Wall – Secondary Tank Farm at Madhuban, Dhuliajan, Dist. Dibrugarh – Assam
DESIGN OF UNDERGROUND R E WALL TO RESIST UPLIFT PRESSURE
Aug-18 15 Lacs Stone Column Completed
4 M/S BPCL M/s Fabtech Projects & Engineers Ltd. Design of Foundation Scheme for 1 x 600 MT LPG Bottling Plant Project Patna –   STONE COLUMNS Nov-17 4 Lacs Stone Column Completed
5 M/S BPCL Phoenix Contracts & Services Pvt. Ltd. Design Of Foundation Scheme For 2 X 600 Mt LPG Bottling Plant Project Patna (Bihar) –   STONE COLUMNS Oct-17 2 Lacs Stone Column Completed
8 M/s Bharat Petroleum Corporation Limited Emerging Buildcon Pvt. Ltd. Ground Improvement using Stone Columns for the Proposed office Building at BPCL Uran Jun-22 Stone Column Completed
Soil Replacement
1 M/s IOCL M/s Fabtech Projects & Engineers Ltd. Design of Bored Cast in-situ Piles for N/S Piperack under Seismic Condition – Bongaigaon Refinery Dhaligaon, Chirang, Assam  –   STONE COLUMNS Jul-17 15 Lacs Soil replacement Completed
2 M/s Hindustan Petroleum Corporation Limited, HPCL M/s Fabtech Projects & Engineers Limited (Fpel) Construction of 3x 500 MT Capacity Mounded Storage Vessels At Jammu LPG Plant – Design of Civil Works Nov-19 Soil replacement Completed
3 M/s Bharat Petroleum Corporation Limited M/S Globe Gas Equipments Industry Pvt. Ltd. Proposed 2 x 300 MT MSV for LPG Bottling Plant Project at Kondapally, Vijayawada – Design of Civil Works Apr-22 Soil replacement Completed
4 M/S Hindustan Petroleum Corporation Limited M/S Ishan Equipments Pvt. Ltd. Proposed 3 X 350 MT Mounded Storage Vessels at Abu Road, LPG Plant – Design of Civil Works Jun-21 Soil replacement Completed
5 Bharat Petroleum Corporation Ltd. (BPCL) Globe Gas Equipments Industry Pvt.Ltd., Mumbai Design of Civil Works for 3 Nos. x 60 Ton Mounded Storage Vessels at BPCL – Kalaburagi Feb-24 Soil replacement Completed
6 Hindustan Petroleum Corporation Ltd. M/S Ishan Equipments Pvt. Ltd., Vadodra Design of Civil Works for 3×350 MT Capacity Mounded Storage Vessels for storage of LPG at Varanasi, UP Dec-23 Soil replacement Completed
7 GAIL (India) Limited M/S Ishan Equipments Pvt. Ltd., Vadodra Design of Civil Works for —– Storage Augmentation of LHC Products at GAIL Vijaipur Feb-23 Soil replacement Completed
8 M/s Bharat Petroleum Corporation Limited M/S Globe Gas Equipments Industry Pvt. Ltd. Proposed 3X150 MT LPG Mounded Bullet for M/s IOCL LPG Plant At Umiam Meghalaya – Design of Civil Works Oct-23 Oil & Gas Completed
9 M/S Hindustan Petroleum Corporation Limited M/S Ishan Equipments Pvt. Ltd. Proposed 3 X 1000 MT MSV Works, Anantapur – Srinagar : Andhra Pradesh – Design of Civil Works Jun-23 Oil & Gas Completed
10 M/s HPCL M/s Ishan Equipment Pvt. Ltd. 3×350 MT Capacity Mounded Storage Vessels for storage of LPG at Abu Road, Rajasthan Jul-21 Oil & Gas Completed
Pre-fabricated vertical drain
1 N. A. M/s Infinite Civil Solutions Pvt. Ltd. Design of Ground Improvement for Bridge Approaches – Construction of Bridges including Approaches across river Zuari on Nh-17/NH-66 Panjim   –   Prefabricated Vertical Drain Associated with Staged Loading for Preconsolidation Mar-18 Ground Improvement Completed
2 M/s Jawaharlal Nehru Port Trust (JNPT) M/s Thakur – Mhatre (JV) Widening of Existing Container Road Towards East Side of Y-Junction to North Gate Complex in JNPT Oct-21 Ground Improvement Completed