Sr. No. |
Client |
Contractor |
Projects |
Year |
Cost |
Sector |
Sub_Sect |
Status |
A |
Earth Retaining Structures / Deep |
1 |
M/s City & Industrial Development Corporation, CIDCO |
M/s Techfab (India) Industries Ltd. |
Analysis and Design of Reinforced Earth Wall with Gabion Facia for the Land Development of Navi Mumbai International Airport Project |
Feb-19 |
15 Lacs |
Earth Retaining |
Airport |
Completed |
2 |
M/s City & Industrial Development Corporation, CIDCO |
M/s City & Industrial Development Corporation, CIDCO |
Analysis, Design and Optimization of Flexible wall of Gabion with integrated tail on Northern side of Navi Mumbai International Airport Project |
Mar-18 |
8 Lacs |
Earth Retaining |
Airport |
Completed |
3 |
Western Coalfields Limited |
M/s Rhoda Cognax Pvt. Ltd. |
Slope stabilization measures at Bhanegaon Mines – Nagpur |
Aug. 2019 |
|
Earth Retaining |
|
Completed |
4 |
M/s Capacit’E |
N. A |
Stability Analysis of deep Excavation for Enigma Tower of Oberoi Realty |
Aug-19 |
0.5 Lacs |
Earth Retaining |
|
Completed |
5 |
M/s Godrej, Sikkim |
M/S Garware Technical Fibres Ltd. |
Proposal for the Restabilization of 35 m high R S Wall Near ETP Location |
Sept-23 |
|
Earth Retaining |
|
Completed |
6 |
M/s Aakar Abhinav Consultants Pvt. Ltd |
|
Preparation of Detailed Design & Drawing for Reinforced Earth Wall (RE Wall) for proposed Three Vehicular underpass in the state of Bihar. ( Tajpur @ Ch. 565+170 km, Dalsinghsarsai @ Ch. 574+546 km and Musuriharari @ Ch. 593+662 km ) |
|
|
|
|
|
13 |
M/s Rail Vikas Nigam Limited |
M/S Garware Technical Fibres Ltd. |
Design of Superimposed Reinforced Soil Wall as a solution for collapsed slopes at chainage 88+626 to 88+700 LHS & 88+700 to 88+730 LHS |
Jun-23 |
|
Earth Retaining |
|
Completed |
14 |
M/s Rail Vikas Nigam Limited |
M/S Garware Technical Fibres Ltd. |
Design of Superimposed Reinforced Soil Wall as a solution for collapsed slopes at chainage 88+630 to 88+790 RHS |
Oct-23 |
|
Earth Retaining |
|
Completed |
15 |
M/s Godrej, Sikkim |
M/S Garware Technical Fibres Ltd. |
Proposal for the Restabilization of 35 m high R S Wall Near ETP Location |
Sept-23 |
|
Earth Retaining |
|
Completed |
16 |
M/s Rail Vikas Nigam Limited |
M/S Garware Technical Fibres Ltd. |
Study of effect of RS Wall Surcharge on the Retaining Wall |
Mar-24 |
|
Earth Retaining |
|
Completed |
17 |
M/s Mayfair Housing, Virar |
M/s Mayfair Housing, Virar |
Design of Earth Retaining Scheme for Two Level Basement for Proposed Construction of Commercial & Residential Building Project at MayFair Virar Garden, Virar(W) |
Mar-23 |
|
Earth Retaining |
|
Completed |
18 |
Shri Kalynavardhak Swtamber Murtipujak Tappagachh Jain Sangh Trust |
MR SUNIL R. SHAH |
Design of Earth Retaining Scheme for Two Level Basement for Proposed Construction of Community Building on Plot No. 189 at Jawahar Nagar, Road No, 13, Goregaon West, Mumbai. |
Feb-24 |
|
Earth Retaining |
|
Completed |
|
|
|
|
|
|
|
|
|
B |
Deep Excavation |
1 |
M/s Gurukrupa Realcon Builders & Developers |
M/s Gurukrupa Realcon Builders & Developers |
Design of Earth Retaining Scheme for Two Level Basement for Proposed Building No. 141 at Pant Nagar – Ghatkopar (E) |
Jan-21 |
|
Earth Retaining |
|
Completed |
2 |
M/s Gurukrupa Realcon Builders & Developers |
M/s Gurukrupa Realcon Builders & Developers |
Design of Earth Retaining Scheme for Two Level Basement for Proposed Building No. 99, CTS No. 184 at Pant Nagar – Ghatkopar (E) |
May-21 |
|
Earth Retaining |
|
Completed |
3 |
Mangalore Refinery and Petrochemicals Limited |
M/s Aakar Abhinav Consultants Pvt. Ltd |
30MLD SWRO Desalination Plant For MRPL, Mangaluru, Karnataka, ( Design of Sheet Piles ) |
Nov-19 |
5.5 Lacs |
Earth Retaining |
|
Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C |
Slope Stabilization |
8 |
M/s Sekura Roads Limited |
M/s Sekura Roads Limited |
Design of Slope Stabilization for 1.63 km stretch – Jorabat-Shillong Expressway Limited (JSEL), NH-40 |
21-May |
|
Slope Stability |
|
Completed |