Forensic Engineering Projects

Forensic Sector
GES is into forensic sector in determining root cause analysis of different kinds of failure thereby assisting surveyors and insurance companies in settling claims.
Root cause analysis of failure of different structures such as
- Residential & Commercial Building
- Industrial Structures, Factories Etc.
- Roads, Highways , Bridges
- Re Walls, Retaining Walls, Earth Retaining And Water Retaining Structures Etc.
At GES, we specialize in the forensic sector, offering expert services in determining the root cause analysis of various types of failures. Our team of experienced professionals assists surveyors and insurance companies in settling claims by providing comprehensive investigations and analyses.
Our Projects for the Forensic Sector
Sr. No. | Client | Surveyor | Projects | Year | Sector | Sub_Sect | Status |
Forensic Engineering | |||||||
1 | M/s Mumbai Nashik Expressway Ltd | M/s JCG Surveyors | 99.5 km stretch between Vadape – Gounde (Mumbai Nashik), section of National Highway 3, Nashik, Maharashtra 422403 – Road Failure Analysis | Aug. 21 In progress | Transport | Roads | Completed |
2 | M/s KNR Muzaffarpur – Barauni Tollway Pvt. Ltd. | M/s JCG Surveyors | Two Laning of Muzaffarpur – Barauni Section of NH-28 from Ch. KM 51+600 to KM 67.00 in Bihar under NHDP, Phase IVB | Nov-20 | Transport | Roads | Completed |
3 | M/s Ramky Infrastructure Ltd. | M/s JCG Surveyors | Four Laning of Barhi – Hazaribaugh Road section of NH-33 frm KM 0.00 to KM 40.500, Jharkhand, under NHDP, Phase III | Dec-20 | Transport | Roads | Completed |
4 | M/s Bhutan Power Corporation | M/s McLarens Insurance Surveyors & Loss Assessors India Pvt Ltd | 400 KV Mengadechhu to Jigmeling Transmission Line Project – Bhutan – Root cause of Transmission Line Tower Failure | Sept. 17 | Transport | Roads | Completed |
5 | Hindalco Industries Ltd. – Muri Works | Aditya Birla Group | Red Mud Storage Pond (Land Fill) Failure Analysis | Mar-18 | Transport | Roads | Completed |
6 | M/s NHAI | M/s Tata Realty and Infrastructure Limited, TRIL | Six Lanning of Chittogarh to Udaipur section of NH-76 from Design Chainage Km. 214+870 to Km. 308+370 in Rajasthan, under NHDP Phase V (Package III) – Finding Root cause of tilt in R E Wall of flyover at Ch. 299+020 to 299+780 LHS (Chittor side) | Apr-19 | Transport | Roads | Completed |
7 | Godrej CGR, Gurugram | M/s Multiplex Construction India Pvt. Ltd. (MPX) M/s Vakil Mehta Seth – Structural Consultant | Proposed Development of Godrej CGR Khasra 542-545, Sector 42, Chakkerpur, Gurugram, Haryana. Munjal Hospitality Pvt. Ltd. (20m Deep Excavation) – – Pressure Grouting for Anchors – Failure of Soil Anchors | Oct-20 | Transport | Roads | Completed |
8 | Gas Authority of India Ltd., GAIL | Contractor : M/s Ishan Equipments Pvt. Ltd. | Procedure For Repair Of Mounded Storage Bullet (MST-C) at GPU, GAIL, Gandhar | 22-May | Water Supply and Sewage | Completed |
CALL US NOW
Mobile: +91 98690 80755
COME VISIT US
Raj Nagar, Jogeshwari West, Mumbai 400102. Maharashtra, INDIA
SEND US A MESSAGE
info@geostructengineering.com