We help the world growing since 2001

Email Support

info@geostructengineering.com

Call Support

+91 98690 80755

Oil & Gas Sector
September 2, 2024
Ongoing Projects
September 2, 2024
Oil & Gas Sector
September 2, 2024
Ongoing Projects
September 2, 2024
Sr. No. Client Contractor Projects Year Cost Sector Sub_Sect Status
A Roads
1 City & Industrial Development Corporation of Maharashtra Limited M/S Aakar Abhinav Consultants Pvt. Ltd. Proposed Construction of Gol Marg Peripheral Road) Along with Allied Work Like S W Drains, Cross Drains, Major & Minor Bridges, Retaining Walls, Fly-Over Bridge, etc. At Chikhaldara Hill Station Project, Dist. Amravati Oct-19 1 Lac Transport Roads Completed
2 Karnataka Road Development Corporation, KRDCL M/s Aakar Abhinav Consultants Pvt. Ltd Proposed Major Bridge Construction Across Doni River near Talikote Village, Tal. Mudhebihala, Dist. Vijayapura Jan-19 1.12 Lacs Transport Roads Completed
3 Tata Projects Limited M/s Hampi Expressway Pvt. Ltd. Four Laning of Hospet – Chitradurga seton of NH13 from Ch. 299+000km to Ch. 418+750 under NHDP – Phase III on DBFOT Jun-19 Transport Roads Completed
4 M/s City & Industrial Development Corporation M/s J. Kumar Infraprojects Ltd. Design of Foundation Scheme for Precast R.C.C Bridge No. 1, 2 and 3 approaches for 34m Wide Coastal Road at Dronagiri, Navi Mumbai Sep-19 Transport Roads Completed
5 Dy, C.E (Construction) -I, Central Railway, Panvel M/s. ARSS Infrastructure Projects Ltd. Construction of Bridge No. 101/5 at Km 101876 in Panvel-Pen section of Panvel-Pen-Roha doubling project. Jul-14 Transport Roads Completed
6 M/s Infinite Civil Solutions Pvt. Ltd. N. A Design of Ground Improvement for Bridge Approaches – Construction of Bridges including Approaches across river Zuari on Nh-17/NH-66 Panjim Mar-18 1 Lac Transport Roads Completed
7 National Highway Authority of India ADANI INFRA (INDIA) LIMITED Providing Consultancy Service of Geotechnical Expert For Consultation on Pond Ash Filling at VUP Approaches For Bilaspur Pathrapali Road Project. Jul-20 Transport Roads Completed
8 National Highway Authority of India M/s Adani Transport Ltd. Four Laning of NH 363 from Mancherial Km 251+900 to Repallewada km 288+510 ( 42km), Telangana under NHDP phase-4 on hybrid annuity mode. Transport Roads Completed
9 Karnataka Road Development Corporation, Limited Bangalore. M/s Aakar Abhinav NCC Ltd. Proposed Major Bridge Construction Across Amarja River near Sarasamba Village, Kalburgi Taluk, Kalburgi District Transport Roads Completed
10 Navi Mumbai Municipal Corporation, Navi Mumbai M/s Aakar Abhinav Construction Of Ghansoli To Airoli Section Of Palm Beach Road Extension Project Transport Roads Completed
11 M/s Adani  Road Transport Ltd. Consultancy Sevices to Access the Requirement of Ground Improvement for RE Wall Foundation and Box Structures with Available Geotechincal Data for the Prebid Estimation Purpose for the Panagarh to Palsit and Palsit to Dankuni Section of NH-19 in the State of West Bengal Mar-22 Transport Roads Completed
12 ADANI INFRA (INDIA) LIMITED Jan-22 Transport Roads Completed
13 Tata Projects Limited Uchit Expressway Private Limited Technical Evaluation of R E Wall at all location and Drainage system – Six Lanning of Chittorgarh – Udaipur section of NH-76 from design change of km 214+870 to  Km 308+370 in the state of Rajasthan (Length 93.5 kms) on DPFPT(Toll) mode under NHDP Phase V (Package III) Nov-21 Transport Roads Completed
14 Maharastra State Road Transport Corporation,MSRTC Jay Kumar Infra Projects Limited Geotechnical Consultancy Work for Construction of six lane Bridge across Ulhas Creek on proposed Motagaon- Mankoli Road on Lump Sum basis in the state of Maharashtra under executed MUIP Dec-17 Transport Roads Completed
15 M/s Adani Transport Ltd. Four laning of Nanasa to Pidgaon section of NH-47 (Old NH-59A) (Indore  Harda, Pkg-III) (Length  47.445 km) Design Ch. 95+000 km to 142+445 km under Bharatmala Pariyojana Phase  I (Economic Corridor) in the state of Madhya Pradesh. : Geotechnical Consultancy for R E walls and Ground Improvement Transport Roads Completed
16 M/s. National Highway Authority of India M/s Tata Six Laning of Chittorgarh to Udaipur Section of NH-76 from Design Chainage Km 214+870 to Km 308+370 in the State of Rajasthan (Length 93.5kM) on DBFOT (TOLL) MODE Under NHDP Phase V (Package – III) Transport Roads Completed
B. Transport Sector ( Airport )
1 M/s City & Industrial Development Corporation of Maharashtra Ltd. N. A. Analysis and Design of Seawall  – Proposed development of Navi Mumbai International Airport “ NMIA Package IV at Ulwe – Navi Mumbai May-18 3 Lacs Transport Airport Completed
2 M/s City & Industrial Development Corporation, CIDCO M/s Constructora San Jose GVK Projects and Technical Services Pvt. Ltd. Design of the Land Development and Ground Improvement using Stone Column for Navi Mumbai International Airport Project Mar-18 35 Lacs Transport Airport Completed
3 M/s City & Industrial Development Corporation, CIDCO Ajwani Infrastructure Private Limited Proposed Construction Of Gabion Walls Along 60 m Wide North Road Of Navi Mumbai International Airport – Review of All Designs And Drawings, Getting Approval from Statutory Authorities And Supervision Of The Project Oct-20 Transport Airport Completed
4 M/s City & Industrial Development Corporation, CIDCO M/s Techfab (India) Industries Ltd. Analysis and Design of Reinforced Earth Wall with Gabion Facia for the Land Development of Navi Mumbai International Airport Project Feb-19 15 Lacs Earth Retaining Airport Completed
5 M/s City & Industrial Development Corporation, CIDCO M/s City & Industrial Development Corporation, CIDCO Analysis, Design and Optimization of Flexible wall of Gabion with integrated tail on Northern side of Navi Mumbai International Airport Project Mar-18 8 Lacs Earth Retaining Airport Completed
6 M/s City & Industrial Development Corporation, CIDCO TIPL JMMIPL (JV) PVT LTD Ulwe River Diversion Work – Design of Reinforced Soil Wall with Gabion Facia Land Development of Navi Mumbai International Airport (Package-I, II & RD) Nov-18 Transport Airport Completed
C Bridges
1 M/s City & Industrial Development Corporation, CIDCO M/s J. Kumar Infraprojects Ltd. Design of Foundation Scheme for Precast RCC Bridge no.1 Approaches on Holding Pond no. 3A for 34 m wide Coastal Road at Dronagiri – Navi Mumbai Jan-18 3.75 Lacs Transport Bridges Completed
2 M/s MMRDA M/s J. Kumar Infraprojects Ltd. Geotechnical Consultancy Services for Six Lane Bridge across Ulhas creek on proposed Motagaon-Mankoli Road, Dombivali, Mumbai 18-Mar Transport Bridges Completed
D Rope Ways
1 M/s Tata Realty and Infrastructure Limited, TRIL M/s Dharamshala Ropeway Ltd. Consultancy Services for Dharamshala Ropeway Project Dec-17 7.5 Lacs Transport Ropeways Completed
E Metro Rail
1 Bangalore Metro Rail Corporation Ltd. M/s ITD Cementation India Pvt. Ltd. Design of Pile Load Test system – Bangalore Metro Rail Corporation Ltd. Aug-17 0.5 Lacs Transport Metro Train Completed
F Bullet Train
1 National High Speed Rail Corporation Limited, NHSRCL M/s Gurukrupa Realcon Builders & Developers Impact Assessment on Proposed NHSRCL Tunnel due to the Proposed Building No. 88, C.T.S. No 184(Pt), S.N0. 236-A at Pantnagar, Ghatkoper, (E), Mumbai Apr-21 Transport Bullet Train Completed
2 National High Speed Rail Corporation Limited, NHSRCL M/S Avani Buildcon Impact Assessment on Proposed NHSRCL Tunnel due to the Proposed ” Avani Signature “, Ghatkopar (W), Mumbai Apr-21 Transport Bullet Train Completed
3 National High Speed Rail Corporation Limited, NHSRCL M/S Mahaveer Impex Impact Assessment on Proposed NHSRCL Tunnel due to the Proposed Residential Cum Commercial Building “Mahaveer Anmol” on Plot No. 16, Sector 2, Ghansoli – Navi Mumbai Oct-21 Transport Bullet Train Completed
4 National High Speed Rail Corporation Limited, NHSRCL M/s Damji Shamji Shah Group Impact Assessment on Proposed NHSRCL Tunnel due to the Proposed Residential cum commercial Building on Plot bearing CTS Nos. 3358-3378 of village Ghatkopar Kirol, Taluka Kurla, Ghatkopar, Mumbai Oct-21 Transport Bullet Train Completed