July 20, 2024Sr. No. | Client | Contractor | Projects | Year | Cost | Sector | Sub_Sect | Status |
Ground Improvement | ||||||||
1 | M/s IOCL | M/s Fabtech Projects & Engineers Ltd. | Design of Bored Cast in-situ Piles for N/S Piperack under Seismic Condition – Bongaigaon Refinery Dhaligaon, Chirang, Assam – STONE COLUMNS | Jul-17 | 15 Lacs | Stone Column | Completed | |
2 | M/s IOCL | M/s Adarsh Noble Corporation Ltd. | Proposed Foundation Scheme for 52.3 Dia. HSD Tank at Paradip Refinery – STONE COLUMNS | Feb-17 | 7 Lacs | Stone Column | Completed | |
3 | M/s Oil India Ltd. | M/s Fabtech Projects & Engineers Ltd. | Design of Guard Pond Walls using concept of Reinforced Earth Wall – Secondary Tank Farm at Madhuban, Dhuliajan, Dist. Dibrugarh – Assam DESIGN OF UNDERGROUND R E WALL TO RESIST UPLIFT PRESSURE |
Aug-18 | 15 Lacs | Stone Column | Completed | |
4 | M/S BPCL | M/s Fabtech Projects & Engineers Ltd. | Design of Foundation Scheme for 1 x 600 MT LPG Bottling Plant Project Patna – STONE COLUMNS | Nov-17 | 4 Lacs | Stone Column | Completed | |
5 | M/S BPCL | Phoenix Contracts & Services Pvt. Ltd. | Design Of Foundation Scheme For 2 X 600 Mt LPG Bottling Plant Project Patna (Bihar) – STONE COLUMNS | Oct-17 | 2 Lacs | Stone Column | Completed | |
8 | M/s Bharat Petroleum Corporation Limited | Emerging Buildcon Pvt. Ltd. | Ground Improvement using Stone Columns for the Proposed office Building at BPCL Uran | Jun-22 | Stone Column | Completed | ||
Soil Replacement | ||||||||
1 | M/s IOCL | M/s Fabtech Projects & Engineers Ltd. | Design of Bored Cast in-situ Piles for N/S Piperack under Seismic Condition – Bongaigaon Refinery Dhaligaon, Chirang, Assam – STONE COLUMNS | Jul-17 | 15 Lacs | Soil replacement | Completed | |
2 | M/s Hindustan Petroleum Corporation Limited, HPCL | M/s Fabtech Projects & Engineers Limited (Fpel) | Construction of 3x 500 MT Capacity Mounded Storage Vessels At Jammu LPG Plant – Design of Civil Works | Nov-19 | Soil replacement | Completed | ||
3 | M/s Bharat Petroleum Corporation Limited | M/S Globe Gas Equipments Industry Pvt. Ltd. | Proposed 2 x 300 MT MSV for LPG Bottling Plant Project at Kondapally, Vijayawada – Design of Civil Works | Apr-22 | Soil replacement | Completed | ||
4 | M/S Hindustan Petroleum Corporation Limited | M/S Ishan Equipments Pvt. Ltd. | Proposed 3 X 350 MT Mounded Storage Vessels at Abu Road, LPG Plant – Design of Civil Works | Jun-21 | Soil replacement | Completed | ||
5 | Bharat Petroleum Corporation Ltd. (BPCL) | Globe Gas Equipments Industry Pvt.Ltd., Mumbai | Design of Civil Works for 3 Nos. x 60 Ton Mounded Storage Vessels at BPCL – Kalaburagi | Feb-24 | Soil replacement | Completed | ||
6 | Hindustan Petroleum Corporation Ltd. | M/S Ishan Equipments Pvt. Ltd., Vadodra | Design of Civil Works for 3×350 MT Capacity Mounded Storage Vessels for storage of LPG at Varanasi, UP | Dec-23 | Soil replacement | Completed | ||
7 | GAIL (India) Limited | M/S Ishan Equipments Pvt. Ltd., Vadodra | Design of Civil Works for —– Storage Augmentation of LHC Products at GAIL Vijaipur | Feb-23 | Soil replacement | Completed | ||
8 | M/s Bharat Petroleum Corporation Limited | M/S Globe Gas Equipments Industry Pvt. Ltd. | Proposed 3X150 MT LPG Mounded Bullet for M/s IOCL LPG Plant At Umiam Meghalaya – Design of Civil Works | Oct-23 | Oil & Gas | Completed | ||
9 | M/S Hindustan Petroleum Corporation Limited | M/S Ishan Equipments Pvt. Ltd. | Proposed 3 X 1000 MT MSV Works, Anantapur – Srinagar : Andhra Pradesh – Design of Civil Works | Jun-23 | Oil & Gas | Completed | ||
10 | M/s HPCL | M/s Ishan Equipment Pvt. Ltd. | 3×350 MT Capacity Mounded Storage Vessels for storage of LPG at Abu Road, Rajasthan | Jul-21 | Oil & Gas | Completed | ||
Pre-fabricated vertical drain | ||||||||
1 | N. A. | M/s Infinite Civil Solutions Pvt. Ltd. | Design of Ground Improvement for Bridge Approaches – Construction of Bridges including Approaches across river Zuari on Nh-17/NH-66 Panjim – Prefabricated Vertical Drain Associated with Staged Loading for Preconsolidation | Mar-18 | Ground Improvement | Completed | ||
2 | M/s Jawaharlal Nehru Port Trust (JNPT) | M/s Thakur – Mhatre (JV) | Widening of Existing Container Road Towards East Side of Y-Junction to North Gate Complex in JNPT | Oct-21 | Ground Improvement | Completed |